A bathroom remodel is one of the best ways to make your home more comfortable — and safer — every single day. Swap a dated tub for a walk-in shower, add a double vanity, fix that soft floor, or finally get rid of the pink tile.
Custom Remodeling LLC remodels primary baths, hall baths, and powder rooms across Southaven, Hernando, Olive Branch, Collierville, and the Memphis area. We pay close attention to waterproofing and tile work, because what's behind the walls matters as much as what you see.
What's included
- Consultation, measurements, and estimate
- Demolition down to studs where needed
- Subfloor and wall inspection for water damage
- Shower waterproofing systems
- Tile floors, walls, and shower surrounds
- Vanity, countertop, mirror, and fixture installation
- Glass shower door coordination
- Ventilation fan, paint, and trim
Our process, step by step
- 1Consultation. We talk about your goals, accessibility needs, and budget.
- 2Design & estimate. We plan the layout and provide a written estimate.
- 3Selections. You choose tile, vanity, fixtures, and glass.
- 4Demo & prep. Old finishes come out; we fix any hidden water damage and prepare walls and floors.
- 5Waterproof & tile. Showers are waterproofed and tile is installed with care.
- 6Fixtures & finish. Vanity, plumbing fixtures, glass, paint, and a final walkthrough.
Bathroom options
Walk-in showers
Curbless or low-curb showers with tile, niches, and benches.
Tub-to-shower conversions
Replace an unused tub with a roomy, easy-access shower.
Vanities & storage
Single or double vanities, linen cabinets, and medicine cabinets.
Safety upgrades
Grab bars, non-slip tile, and wider entries for aging in place.
Signs you need a bathroom remodel
- Cracked tile or failing grout
- Soft spots in the floor near the tub or toilet
- Mold or mildew that keeps coming back
- A tub nobody uses
- Outdated fixtures and poor lighting
Timeline expectations
Most bathroom remodels take two to four weeks depending on size, tile complexity, and custom glass lead times. Powder rooms are often faster.
Bathroom Remodeling FAQ
How long does a bathroom remodel take?
Typically two to four weeks for a full bath, depending on tile work and glass lead times.
Can you convert my tub to a walk-in shower?
Yes — tub-to-shower conversions are one of our most requested projects.
What if you find water damage?
We'll show you, explain options, and price any additional work before proceeding.
Can you make my bathroom more accessible?
Yes. We install low-curb showers, grab bars, benches, and other aging-in-place features.






